Local Sports Centre
Project Duration: Duration 8 months
Project Description: Trend IQ3 based system with open protocol integration to Tridium based AHU control system and Grundfoss pumps via ModBus. Very widespread use of open protocols gave the client a modern future proof BEMS offering fully functional integration of the HVAC system at a much-reduced capital cost.
Project Outcome: The project ultimately is a very good example of how seamlessly modern HVAC control systems can integrate with each other when all parties fully commit to the project.
Subscribe to our newsletter for letest updates